Thus, the speed limit will now be reduced to 40 km/h on this section as it was previously diverted to 60 km/h. The minister, at the same time, announced the installation of cameras.
Motorists heading to the capital must be patient. Indeed, there will be a small deviation in the amount of Sorèze, at the southern entrance of Port Louis, that is to say from the device ("Ring Road") where the construction of a tunnel have been initiated since October.
Construction of a tunnel will last 10 months, let there be heard. 45% of the first phase of the Ring Road have already been completed and it should be completed by late 2012. The circular route includes a 1.3 km tunnel under the mountain. In fact, this route starts in the region of Sorèze, near Montebello - after the new station of Indian Oil, go through the Guibies and rear of the estate straws. It will be a tunnel dug under the mountain of lead signals to the vicinity of the Chinese pagoda and the headquarters of the MSDTF.
This route will take the lead of the hill Monneron, by cross Vallée-Pitot to lead the way to the Pamplemousses, near the premises of the MSPCA. She finally borrow on the military road to rally the roundabout leading to the port. This road is supposed to offer an alternative access to the various entrances to the city from the south.
Nouvelles connexes